设为首页收藏本站rss

简体中文 繁體中文 English 日本語 Deutsch 한국 사람 بالعربية TÜRKÇE português คนไทย

南京金友网 做南京人的网上家园  - 南京金友网

 找回密码
 立即注册

QQ登录

只需一步,快速开始

微信登录

微信扫一扫,快速登录

手机动态码快速登录

手机号快速注册登录

查看: 2968|回复: 0
收起左侧

机工英语口述题库

[复制链接]
累计签到:190 天
连续签到:3 天

1004

主题

99

回帖

1万

积分

管理员

Rank: 9Rank: 9Rank: 9

积分
16579

最佳新人活跃会员热心会员推广达人宣传达人灌水之王突出贡献优秀版主荣誉管理论坛元老

发表于 2019-6-25 23:37:08 | 显示全部楼层 |阅读模式 IP:- 中国江苏南京

马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。

您需要 登录 才可以下载或查看,没有账号?立即注册 微信登录 手机动态码快速登录

x
口述题
Lesson 1
Task3
1. Make a brief self-introduction
My name is Wang wei. I’m 24 years old. I’m come from XX province. I graduated from Wuhan maritime middle professional school. I majored in marine engineering management. I have worked on board for three years. Now I am a motorman. I love my job.  
2. Talk about your family.
There are three people in my family: my father, my mother and me. My father is a teacher. My mother is a doctor. I am a motorman.
4. Talk about your work experience.
When I graduated from Nanjing Communication Technical School in 2006,I have work four years. I have worked at Shanghai Ocean Shipping Company Ltd and served as the Forth Engineering at FEIHE, ZIYAHE, MATSUKO and BINGHE Ship. Through daily management and inspection, I ensured the good conditions of the machinery and equipment.
Lesson 2
Task3
2. Talk about the common machinery on board.
There are many types of marine machinery on board, such as Main engine, Generator, Boiler, Pumps and so on.
Main engine drives the vessel to sail and it is the heat of the engine room. Generators generate the electrical power. Boiler produces steam for all kinds of service. Pumps serve for other machines or ship’s operation.
3. Talk about your daily work on board as a motorman.
The motorman should be on duty in the engine control room from 8 a. m. to 4 p.m. in the UMS. During the watch, he should check the working conditions of all the equipment in the engine room, levels of all tanks and engine room bilge wells. He should keep the engine room clean and tidy.
Lesson 4
1. Talk about the auxiliary machinery in the engine room.
The auxiliary machinery is much more in number. They are not as big as the main engine. They include the generators, the boilers, the fresh water generators, the pumps and the steering gear, the windlass, the winches and cranes. They are very important for voyage. Without them, the ship can’t sail at sea.
3. Talk about oil treatment.
Both fuel oil and lubricating oil require treatment before passing to the engine. This will involve storage and heating to allow separation of water present, coarse and fine filtering to remove solid particles and also centrifuging.
Lesson 7
3. Say something about stand-by engine before departure.
After this order is given from bridge, the following work should be done one by one:
Check main engine telegraph and ship’s clock
Test the steering gear operation
Start another generator and put in use
Start all necessary pumps
Put on turning gear and let it run about half hour
Drain water from air receiver
Lesson 8
Task3
2. Talk about actions to be taken when a fire occurs in the engine room.
If a fire occurs in the engine room, the following actions should be taken at once: (1) Report to the bridge or push the alarm button; (2) Close the ventilation doors; (3) Shut off the electric power; (4) Ensure the fire source; (5) Put out the fire by portable extinguisher, (6) Check the number of the engine crew; (7) Release carbon dioxide.
3. Talk about actions to be taken in event of collision.
In event of collision, the following actions should be taken at once: (1) Stand by the engine; (2) Cut off electric power, oil, water and air near the accident place; (3) Carry out Captain’s order.
4. Talk about actions to be taken when a blackout occurs in the engine.
If a black out occurs the following actions should be taken at once: (1) Inform the bridge and chief engineer; (2) Start up the standby generator; (3) Supply the power; (4) Restore the switch of automatic trip.
Lesson 9
Task3
2. Actions to be taken in the event of flooding.
1) Acting in full compliance with the Muster list.
2) Actions to be taken in terms of notifying, locating, restricting, and handling.
In the event of flooding, the following actions should be taken at once1) Report to the duty officer, the chief engineer, the captain at once; (2) Turn on the alarm; (3) All the crew members should act in full compliance with the Muster List; (4) Slow down the M/E; (5) close watertight doors; (6) open the emergency valve; (7) start seawater pump; (8) discharge some water overboard.
4. Talk about an abandon ship drill.
An abandon ship drill is carrying out a least one month or when more than 25 percent of the ship’s personal have been changed. In An abandon ship drill the following actions should be taken 1) Start up the emergency generator; (2) shut down the boiler; (3) cut off fuel supply; (4) close the ventilators, doors and so on; (5) close watertight doors; (6) launch lifeboat.
Lesson 13
Task3
2. As a motorman, what maintenance work do you usually do during your watch?
As the motorman in charge of watch, the maintenance work in the engine room is as follows: I shall ensure that the main propulsion plant, auxiliary machinery and steering gear are in good order. The current operational parameters of all machinery should be observed, such as the exhaust gases temperature of main engine, the cylinder jacket outlet cooling water temperature and pressure etc. During watch, the bridge orders must be carried out right now. Any abnormal parameters in relation to the equipment should be paid attention.

"小礼物走一走,来南京金友网支持我"
还没有人打赏,支持一下
走自己的路
嗨!您好:
欢迎来到 南京金友网。
我的名字叫狗蛋
很高兴能够为您服务!
如果已经注册【立即登录】
还没有账号请【立即注册】
快速回复 返回顶部 返回列表